Skip to content
  • TEL:
    01423 878888
  • FAX:
    01423 878880
  • EMAIL:

Stansted Airport - New Arrivals Terminal Extension

Back

Overview

The £40 million project will create an extra 5,900m2 of floor space to the international arrivals area of the terminal, with the expanded immigration, baggage and customs halls opening in June 2008 and the project fully completed by December 2008.

Mechanical Contractor: Mace M&E

Services Consultant: WSP

Products Supplied:

  • Expansion Joints
  • Pipe Slide Guides
  • Cleated Anchor Brackets
  • Rubber Pump Flexible Connectors
  • Braided St/St Flexible Hoses
  • Automatic Dosing Sets
  • Dirt Separator
stansted
Top