top of page
Process Industry

Reckitt Benckiser

Nottingham

Overview

An extension of the 12Barg / 250deg.C Superheated Steam line from an existing site system owned by Boots, to feed via new de-superheaters a new processing plant in the Reckitt Benckiser building. Pipe Solutions advised on the total control of thermal expansion, analysing the pipe stresses using Caesar II Software and supplying the necessary equipment for correct control of the expansion.

Mechanical Contractor: Brettex Engineering Ltd

Services Consultant: Lorien Engineering Solutions Ltd


Products Supplied:

  • Caesar II® Pipe Stress Analysis

  • Expansion Joints

  • Guides

  • Skids

  • Anchors

  • Variable Spring Supports

Project Gallery

bottom of page